Standard Practice for Installation of Underground Precast Concrete Utility Structures
STANDARD published on 15.12.2020
Why Redline?
A PDF redline is a quick and easy way to compare all of the changes between the current, active standard and the previous version.
With a redline you'll immediately see:
Save Time and Trouble!
With a Redline you no longer have to spend time trying to determine what has changed in the new standard! Redlines save you time and ensure you see what the changes are to the standard.
Price
When you select the "Active + Redline" option you get both documents! Best of all, the cost of an Active + Redline is only slightly more than buying the Active Standard by itself.
Designation standards: ASTM C891-20
Publication date standards: 15.12.2020
The number of pages: 3
Approximate weight : 9 g (0.02 lbs)
Country: American technical standard
Category: Technical standards ASTM
This practice covers the procedures to be followed in the planning, site preparation, and installation of underground precast concrete utility structures. The installation area shall be surveyed using the workprint and a checklist to identify the work to be done and to determine that the plans are correct. Permits required to do work in accordance with the detail plans shall be secured before starting the job. All permits or a record of the permits shall be retained on the job for immediate reference. Safety requirements for construction shall be in accordance with all federal, state, and local regulations. Shoring for construction shall be in accordance with all federal, state, and local regulations.
Keywords:
ICS Number Code 91.100.30 (Concrete and concrete products)