Standard Practice for Minimum Geospatial Data for Representing Coal Mining Features
STANDARD published on 1.11.2020
Why Redline?
A PDF redline is a quick and easy way to compare all of the changes between the current, active standard and the previous version.
With a redline you'll immediately see:
Save Time and Trouble!
With a Redline you no longer have to spend time trying to determine what has changed in the new standard! Redlines save you time and ensure you see what the changes are to the standard.
Price
When you select the "Active + Redline" option you get both documents! Best of all, the cost of an Active + Redline is only slightly more than buying the Active Standard by itself.
Designation standards: ASTM D7780-20
Publication date standards: 1.11.2020
The number of pages: 27
Approximate weight : 81 g (0.18 lbs)
Country: American technical standard
Category: Technical standards ASTM
Keywords:
bond release, coal mining, coal mining operation, coal mining permit boundary, mine permit, mine reclamation, phase bond release, reclamation performance bond release, release of jurisdiction, surface mining, termination of jurisdiction,, ICS Number Code 35.240.99 (IT applications in other fields),73.020 (Mining and quarrying)