Standard Practice for Job Productivity Measurement
STANDARD published on 1.4.2020
Why Redline?
A PDF redline is a quick and easy way to compare all of the changes between the current, active standard and the previous version.
With a redline you'll immediately see:
Save Time and Trouble!
With a Redline you no longer have to spend time trying to determine what has changed in the new standard! Redlines save you time and ensure you see what the changes are to the standard.
Price
When you select the "Active + Redline" option you get both documents! Best of all, the cost of an Active + Redline is only slightly more than buying the Active Standard by itself.
Designation standards: ASTM E2691-20
Publication date standards: 1.4.2020
The number of pages: 25
Approximate weight : 75 g (0.17 lbs)
Country: American technical standard
Category: Technical standards ASTM
Keywords:
accounting, agile, agile construction, construction accounting, construction production, construction productivity measure, construction put in place, cost codes, CPIP, effectiveness, efficiency, individual productivity, job labor variance, job layout, job productivity, job productivity assurance and control, job productivity measurement, job tracking, JPAC, JPM, labor productivity, labor variation, lean, lean construction, low cost provider, observed percent complete, planning