NORMSERVIS s.r.o.

SAE ARP5453

Training Pilots Prior to Simultaneous Instrument Landing System (ILS) Precision Runway Monitor (PRM) Approaches to Closely-Spaced Parallel Runways

STANDARD published on 1.8.2006

English -
electronic design (pdf) (147.50 USD)

English -
Print design (147.50 USD)

The information about the standard:

Designation standards: SAE ARP5453
Publication date standards: 1.8.2006
Country: American technical standard
Category: Technical standards SAE

Annotation of standard text SAE ARP5453 :


This SAE Aerospace Recommended Practice (ARP) provides guidance to prepare pilots to participate in simultaneous instrument landing system (ILS) precision runway monitor (PRM) approaches to closely-spaced parallel runways.

SUBJECT TAXONOMY: Human factors
SUBFILE: Aerospace
TYPE OF DOCUMENT: Aerospace Standard