UIC - International railway union - Page 179

Standards UIC - International railway union - Page 179

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 179" by:    


UIC D101/DT96-1ed.

Messen des Längsverschiebewiderstandes des Gleises zur Bestimmung der Kon stante K (Faktor der Theorie von Herrn Schöwel), aufgestellt im Rahmen der Tätigkeit des Sachverständigen ausschusses für die OREFrage D 101

Selected format:

Show all technical information.
420.60 USD


in 7 working days
UIC D101/DT98-1ed.

Waagerechte Brückenlagerreaktionskräfte infolge Brems oder Anfahrkräfte, auf gestellt von Herrn Dipl. Ing. F. Bijl, NS, im Rahmen der Tätigkeit des Sach verständigenausschusses für die ORE Frage D 101

Selected format:

Show all technical information.
280.80 USD


in 7 working days
UIC D101/RP1-1ed.

Magnitude and distribution of braking and starting forces in the track

Selected format:

Show all technical information.
280.80 USD


in 7 working days
UIC D101/RP10-1ed.

Enquiry into the laying of continuous welded rails on structures

Selected format:

Show all technical information.
280.80 USD


in 7 working days
UIC D101/RP11-1ed.

Braking forces on a prestressed reinforced concrete bridge with neoprene bearings

Selected format:

Show all technical information.
280.80 USD


in 7 working days
UIC D101/RP12-1ed.

Measuring methods adopted in the study of thermal phenomena associated with interaction between CWR track and bridges

Selected format:

Show all technical information.
280.80 USD


in 7 working days
UIC D101/RP13-1ed.

Braking and starting tests on a continuous triplespan reinforced concrete bridge, with neoprene bearings

Selected format:

Show all technical information.
280.80 USD


in 7 working days
UIC D101/RP14-1ed.

Theoretical studies and calculations concerning the effects of longitudinal forces on tracks and bridges due to starting and braking

Selected format:

Show all technical information.
280.80 USD


in 7 working days
UIC D101/RP15-1ed.

Braking and starting forces on bridges Synthesis Report

Selected format:

Show all technical information.
280.80 USD


in 7 working days
UIC D101/RP16-1ed.

Thermal Phenomena in the interaction between CWR and structure on two RATP reinforced concrete bridges of 35 m length (with track laid on ballast and with track laid direct)

Selected format:

Show all technical information.
280.80 USD


in 7 working days

Entries shown from 1780 to 1790 out of a total of 2588 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.