UIC - International railway union - Page 59

Standards UIC - International railway union - Page 59

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 59" by:    


UIC A122/DT40-1ed.

The effect of thyristor noise on the quality of telephone communications, by Dr.Ing. Vollmeyer

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A122/DT53-1ed.

Bestimmung der elektrischen Gleisparameter in Abhängigkeit von der Frequenz und den vormagnetisierenden Strömen, aufgestellt vom ORESachverständigenausschuss A 122

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A122/DT56-1ed.

Versuche mit der Thyristorlokomotive 184 der DB und der Lokomotive E 444 der FS auf dem Streckennetz der FS mit 3 kV Gleichstrom, vom SVA A 122

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A122/DT64-1ed.

Measurement of interference in railway substation filter installations and track circuits caused by traction vehicles with choppers, by ORE Specia lists Committee A 122

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A122/DT72-1ed.

Distribution of the overhead line current between rail and ground depending on the frequency and the distance of a train from the sub station, by ORE Specialists Committee A 122

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A122/DT73-1ed.

Tests to determine disturbance caused in telecommunications installations by electric traction vehicles in a.c. (25 kV, 50 Hz) and d.c. (3 kV) systems. Part I: SNCF test results obtained on the AnnemasseSt. Gervais line (25 kV, 50 Hz) Part II: PKP test re

Selected format:

Show all technical information.
553.50 USD


in 7 working days
UIC A122/DT91-1ed.

Calculation of interfrence with track circuits due to electric traction, prepared by ORE Specialists Committee A 122

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A122/DT92-1ed.

Oscillation phnenomena in the traction current circuit prepared by ORE Specialists Committee A 122

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A122/DT93-1ed.

Untersuchung der Ausbreitung und überlagerung von Stromrichter Oberschwingungen im Bahnnetz 16 2/3 Hz sowie von Möglichkeiten zur Dämpfung der Fahrleitungsresonanzschwingungen, aufgestellt vom ORESVA A 122

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A122/RP1-1ed.

Theoretical investigations to determine the disturbances of signalling and communication installations caused by thyristorcontrolled locomotives

Selected format:

Show all technical information.
276.70 USD


in 7 working days

Entries shown from 580 to 590 out of a total of 2580 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.