We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Earthworks - Part 2: Classification of materials
WITHDRAWN published on 1.5.2019
Selected format:Earthworks - Part 3: Construction procedures
WITHDRAWN published on 1.5.2019
Selected format:Earthworks - Part 4: Soil treatment with lime and/or hydraulic binders
WITHDRAWN published on 1.5.2019
Selected format:Earthworks - Part 5: Quality control
WITHDRAWN published on 1.5.2019
Selected format:Earthworks - Part 7: Hydraulic placement of extractive waste
WITHDRAWN published on 1.10.2021
Selected format:Earthworks - Part 8: Alternative materials in earthworks
WITHDRAWN published on 1.3.2025
Selected format:Earthworks - Soil treatment tests - Part 1: pH-test for determination of the lime requirement of soils for stabilization (Lime Fixation Point LFP, Lime Modification Optimum LMO)
Standard published on 1.5.2022
Selected format:Earthworks - Soil treatment tests - Part 2: Test of evaluation of the aptitude of a dry material to emit dust
Standard published on 1.5.2022
Selected format:Earthworks. Geotechnical laboratory tests. Part 1: Degradability test standard
Standard published on 1.2.2023
Selected format:Earthworks. Geotechnical laboratory tests. Part 2: Fragmentability test standard
Standard published on 1.2.2023
Selected format:Latest update: 2026-09-11 (Number of items: 2 300 165)
© Copyright 2026 NORMSERVIS s.r.o.