We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Managed Pressure Drilling Operations - Pressurized Mud Cap Drilling with a Subsea Blowout Preventer
Translate name
STANDARD published on 1.6.2019
| Availability | Sold out |
| Price | ONREQUEST excl. VAT |
| ON REQUEST |
Designation standards: API RP 92P-ed.1
Publication date standards: 1.6.2019
SKU: NS-1140277
The number of pages: 67
Approximate weight : 201 g (0.44 lbs)
Country: American technical standard
*) If the goods is not available in stock and must be ordered at the publisher, the actual shipping and handling costs will be added. We will inform you about the details based on your request sent to info@normservis.cz, eventually dialing +420 566 621 759.
API RP 92P, 1st Edition, June 2019 - Managed Pressure Drilling Operations - Pressurized Mud Cap Drilling with a Subsea Blowout Preventer
This document addresses recommended practices for pressurized mud cap drilling (PMCD) from a floating rig with a subsea BOP stack. When massive lost circulation conditions are encountered, PMCD can be implemented to allow well construction operations to continue:
Although this document only addresses PMCD, most of the equipment described may also be used for the surface back-pressure (SBP) method of managed pressure drilling. However, much of the equipment used for SBP is not required for PMCD, and will not be covered here.
The following methods, described briefly, are also used during lost circulation conditions; however, they are outside the scope of this document:
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2025-12-29 (Number of items: 2 253 390)
© Copyright 2025 NORMSERVIS s.r.o.