We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Standard Practice for Least Cost (Life Cycle) Analysis of Concrete Culvert, Storm Sewer, and Sanitary Sewer Systems (Includes all amendments And changes 10/30/2015).
Automatically translated name:
Standard Practice for Least Cost (Life Cycle) Analysis of Concrete Culvert, Storm Sewer, and Sanitary Sewer Systems
STANDARD published on 1.12.2010
Designation standards: ASTM C1131-10e1
Note: WITHDRAWN
Publication date standards: 1.12.2010
SKU: NS-9640
The number of pages: 6
Approximate weight : 18 g (0.04 lbs)
Country: American technical standard
Category: Technical standards ASTM
Keywords:
acceptance criteria, concrete, costs, culvert, inflation rate, interest rate, least cost analysis, life cycle analysis, pipe, procedures, project design life, sanitary sewer, service life, storm sewer, Bidding (on projects), Building economics, Construction materials, Culvert pipe (concrete), Design--piping systems, Inflation/interest effects, Least cost analysis (LCA), Life-cycle cost (LCC) analysis, Maintenance, Preconstruction evaluation, Project design life
Significance and Use | ||
The significance of the LCA method is that it is a comprehensive technique for taking into account all relevant monetary values over the project design life and provides a measure of the total cost of the material, system, or structure. The LCA method can be effectively applied in both the preconstruction and bid stages of projects. After bids are taken, real costs can be used instead of estimates. |
||
1. Scope | ||
1.1 This practice covers procedures for least cost (life cycle) analysis (LCA) of materials, systems, or structures proposed for use in the construction of concrete culvert, storm sewer, and sanitary sewer systems. Note 1—As intended in this practice, examples of analyses include, but are not limited to the following: (1) materials-pipe linings and coatings, concrete wall thicknesses, cements, additives, etc.; (2) systems-circular pipe, box sections, multiple lines, force mains, etc.; and (3) structures-wet and dry wells, pump and lift stations, etc. 1.2 The LCA method includes costs associated with planning, engineering, construction (bid price), maintenance, rehabilitation, replacement, and cost deductions for any residual value at the end of the proposed project design life. 1.3 For each material, system, or structure, the LCA method determines in present value constant dollars, the total of all initial and future costs over the project design life, and deducts any residual value. 1.4 Major factors in the LCA method include project design life, service life, and relevant interest and inflation rates. |
||
2. Referenced Documents | ||
|
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2024-05-09 (Number of items: 2 898 531)
© Copyright 2024 NORMSERVIS s.r.o.