We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Standard Practice for Direct Push Installation of Prepacked Screen Monitoring Wells in Unconsolidated Aquifers
STANDARD published on 1.7.2010
Designation standards: ASTM D6725-04(2010)
Note: WITHDRAWN
Publication date standards: 1.7.2010
SKU: NS-36286
The number of pages: 15
Approximate weight : 45 g (0.10 lbs)
Country: American technical standard
Category: Technical standards ASTM
Keywords:
aquifer, direct push, groundwater, monitoring well, prepacked screen, water quality: Aquifers, Direct push installation, Ground-water monitoring/sampling, Installation--ground water/subsurface devices/applications, Prepacked well screen, Site identification/investigation/selection, Water quality monitoring, ICS Number Code 13.060.10 (Water of natural resources)
Significance and Use | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
This practice is intended to provide the user with information on the appropriate methods and procedures for installing prepacked screen monitoring wells by direct push methods. The monitoring wells may be used to obtain representative water quality samples for aqueous phase contaminants or other analytes of interest, either organic or inorganic (Kram et al. 2000, McCall 2000, McCall et al. 1997). The monitoring wells may also be used to obtain information on the potentiometric surface of the local aquifer and properties of the formation such as hydraulic conductivity or transmissivity. Use of direct push methods to install monitoring wells can significantly reduce the amount of potentially hazardous drill cuttings generated during well installation at contaminated sites. This may significantly reduce cost of an environmental site investigation and groundwater monitoring program. Minimizing generation of hazardous waste also reduces the exposure hazards to site workers, local residents, and the environment. Direct push methods for monitoring well installation are limited to use in unconsolidated formations such as alluvial/stream sediments, glacial deposits, and beach type sediments. Direct push methods are generally successful at penetrating clays, silts, sands and some gravel. Deposits such as soils with thick caliche layers, or glacial tills with large cobbles or boulders may be difficult or impossible to penetrate to the desired depth. Direct push methods are not designed for penetration of consolidated bedrock such as limestone, granite or gneiss. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1. Scope | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.1 This practice is based on recognized methods by which direct push monitoring wells may be designed and installed for the purpose of detecting the presence or absence of a contaminant, and collecting representative groundwater quality data. The design standards and installation procedures herein are applicable to both detection and assessment monitoring programs for facilities. 1.2 The recommended monitoring well design, as presented in this practice, is based on the assumption that the objective of the program is to obtain representative groundwater information and water quality samples from aquifers. Monitoring wells constructed following this practice should produce relatively turbidity-free samples for granular aquifer materials ranging from gravels to silty sand. Strata having grain sizes smaller than the recommended design for the smallest diameter filter pack materials should be monitored by alternative monitoring well designs which are not addressed in this practice. 1.3 Direct push procedures are not applicable for monitoring well installation under all geologic and soil conditions (for example, installation in bedrock). Other rotary drilling procedures are available for penetration of these consolidated materials for well construction purposes (Guide D5092). Additionally, under some geologic conditions it may be appropriate to install monitoring wells without a filter pack (EPA 1991). Guide D6724 may be referred to for additional information on these and other methods for the direct push installation of groundwater monitoring wells. 1.4 The values stated in inch-pound units are to be regarded as standard. The values in parentheses are for information only. 1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 1.6 This practice offers a set of instructions for performing one or more specific operations. This document cannot replace education or experience and should be used in conjunction with professional judgement. Not all aspects of this practice may be applicable in all circumstances. This ASTM standard is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this document be applied without consideration of the project's many unique aspects. The word “Standard” in the title of this document means only that the document has been approved through the ASTM consensus process. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2. Referenced Documents | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Historical
1.9.2010
Historical
1.7.2010
Historical
1.7.2013
Historical
1.3.2014
Historical
1.3.2014
Historical
1.3.2014
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2025-05-12 (Number of items: 2 199 201)
© Copyright 2025 NORMSERVIS s.r.o.