We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Standard Practice for Performing and Reporting Cost Analysis During the Design Phase of a Project
STANDARD published on 1.4.2012
Designation standards: ASTM E1804-12
Note: WITHDRAWN
Publication date standards: 1.4.2012
SKU: NS-43111
The number of pages: 4
Approximate weight : 12 g (0.03 lbs)
Country: American technical standard
Category: Technical standards ASTM
Company organization and management in generalConstruction industry in general
Keywords:
analysis, cost, design, estimating, Building design and construction, Building economics, Cost analysis (of building constructions), ICS Number Code 03.100.01 (Company organization and management in general), 91.010.01 (Construction industry in general)
Significance and Use | ||||||||||
This practice increases the level of communication, provides an organized approach to cost control during the design of a project, and also provides a means of identifying extraordinary cost items and changes in assumptions between estimates. The users of this practice include owners, developers, contractors, cost professionals, estimators, architects, engineers, specification writers, quantity surveyors, and anyone charged with the responsibility of successfully managing the design of a building and its related site work within a specified project budget. Use this reporting format during the following: Contracting for design cost analysis services, Comparing the current design costs to a previous estimate, and Responding to each design phase. This practice provides a tool for analyzing design options and examining strategies to maintain the project budget. |
||||||||||
1. Scope | ||||||||||
1.1 This practice covers an arranged method for providing cost analysis during the design phase of a building project. 1.2 The use of this practice increases the level of communication between the design professional, owner, and the cost professional providing the cost consulting services. 1.3 The practice establishes a structured method to support design decisions. 1.4 The practice provides design and cost professionals with a framework for historically tabulating information to be used on relevant future projects. |
||||||||||
2. Referenced Documents | ||||||||||
|
Historical
1.8.2009
Historical
1.1.2013
Historical
1.3.2011
Historical
1.3.2011
Historical
1.7.2011
Historical
1.2.2008
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2024-05-15 (Number of items: 2 898 636)
© Copyright 2024 NORMSERVIS s.r.o.