We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Standard Practice for Measuring Cost Risk of Buildings and Building Systems and Other Constructed Projects
STANDARD published on 1.4.2012
Designation standards: ASTM E1946-12
Note: WITHDRAWN
Publication date standards: 1.4.2012
SKU: NS-43687
The number of pages: 9
Approximate weight : 27 g (0.06 lbs)
Country: American technical standard
Category: Technical standards ASTM
Keywords:
cost model, cost risk analysis, Monte Carlo simulation, sensitivity analysis, UNIFORMAT II, BCRA (building cost risk analysis), Building economics, Cost analysis (of building constructions), Project management, Risk analysis, ICS Number Code 91.010.20 (Contractual aspects)
Significance and Use | ||||||||||||
Measuring cost risk enables owners of buildings and other constructed projects, architects, engineers, and contractors to measure and evaluate the cost risk exposures of their construction projects. Specifically, cost risk analysis (CRA) helps answer the following questions: What are the probabilities for the construction contract to be bid above or below the estimated value? How low or high can the total project cost be? What is the appropriate amount of contingency to use? What cost elements have the greatest impact on the project’s cost risk exposure? CRA can be applied to a project's contract cost, construction cost (contract cost plus construction change orders), and project cost (construction cost plus owner's cost), depending on the users' perspectives and needs. This practice shall refer to these different terms generally as “project cost.” |
||||||||||||
1. Scope | ||||||||||||
1.1 This practice covers a procedure for measuring cost risk for buildings and building systems and other constructed projects, using the Monte Carlo simulation technique as described in Guide E1369. 1.2 A computer program is required for the Monte Carlo simulation. This can be one of the commercially available software programs for cost risk analysis, or one constructed by the user. |
||||||||||||
2. Referenced Documents | ||||||||||||
|
Historical
1.10.2010
Historical
1.4.2009
Historical
1.4.2012
Historical
1.11.2011
Historical
1.5.2010
Historical
1.9.2008
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2024-04-29 (Number of items: 2 896 215)
© Copyright 2024 NORMSERVIS s.r.o.