We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
IEEE Approved Draft Guide for Conducting Corona Tests on Hardware Assemblies for Overhead Transmission Lines and Substations
Translate name
STANDARD published on 2.2.2026
Designation standards: IEEE P1829
Publication date standards: 2.2.2026
SKU: NS-1249268
Approximate weight : 300 g (0.66 lbs)
Country: International technical standard
Category: Technical standards IEEE
Revision Standard - Active - Draft.
This guide establishes uniform procedures for the testing of transmission line and station bus hardware assemblies in high voltage (>100 kV) laboratories. Two tests are described. The first one is a corona performance test. The second is a radio interference voltage (RIV) test. The first test uses visible techniques to determine the onset of positive corona. The second test is a measurement of the RIV voltage according to ANSI C63.2 or CISPR 16-1-1 and CISPR 18-2. This guide does not address the permissible radio interference (RI) limits or specified corona extinction voltages. They are set either by regulation or by agreement between the end user and hardware manufacturer.
ISBN: 979-8-8557-2554-4, 979-8-8557-2554-4
Number of Pages: 32
Product Code: STDUD28202, STDAPE28202
Keywords: corona, RIV, tests, hardware assemblies, IEEE 1829(TM), visible, positive corona
Category: Power Transmission and Distribution
Draft Number: P1829/D2, Aug 2025 - UNAPPROVED DRAFT, P1829/D2, Aug 2025 - APPROVED DRAFT
Do you want to be sure about the validity of used regulations?
We offer you a solution so that you could use valid and updated legislative regulations.
Would you like to get more information? Look at this page.
Latest update: 2026-04-21 (Number of items: 2 274 412)
© Copyright 2026 NORMSERVIS s.r.o.