Standard IRS 40404-2-1ed. 1.10.2022 preview

IRS 40404-2-1ed.

Compendium of the data to be exchanged between Railway Undertakings (RUs) for the purpose of conveying freight traffic

Translate name

STANDARD published on 1.10.2022


Language
Format
AvailabilityIN STOCK
Price715.10 USD excl. VAT
715.10 USD

The information about the standard:

Designation standards: IRS 40404-2-1ed.
Publication date standards: 1.10.2022
SKU: NS-1091445
The number of pages: 23
Approximate weight : 69 g (0.15 lbs)
Country: International technical standard
Category: Technical standards IRS

Annotation of standard text IRS 40404-2-1ed. :

This IRS specifies the data to be exchanged as necessary for the operation of trains and the forwarding of wagons, intermodal units, or other rail vehicles. In rail freight transport, data required for operation of a train, and the wagons, loading units and other rail vehicles that it contains, must be shared with the RUs that continue train operation and individual transport operations. This serves as the basis for safe, efficient, and economical train and transport operations. If such data is transmitted to the next RU in a timely manner, the data does not have to be collected and/or recorded again by the participating RUs. The RUs (see Abbreviations and Symbols - page 6) agree bilaterally as to which version is to be used. Data is exchanged in respect of the train, wagon, loading units and consignments. Data is exchanged using the XML message format. The XSD schema (technical description) for version 2.0 (see Reference documents - page 5) and subsequent versions can be found in a zip folder available with the download file of this IRS. The XLS representation of the message contents (functional description) for version 2.0 (see Reference documents) and subsequent versions can be found in a zip folder available with the download file of this IRS. Information is compiled for all vehicles in freight trains and traction units in principle. HERMES message timing and updates The HERMES message (see Abbreviations and Symbols) should be sent as soon as possible upon completion of train composition before handover to the next RU.The information concerning traction transmitted in the HERMES message is up to date at the last handling station prior to handover to the next RU. The HERMES message should be sent as early as possible, even when the traction at the handover location is not yet known. A further HERMES message should be sent when the information on traction is available.

We recommend:

Technical standards updating

Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.

Would you like to know more? Look at this page.




Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.