We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements
Translate name
STANDARD published on 16.3.2021
Designation standards: IWA 33-3:2021
Publication date standards: 16.3.2021
SKU: NS-1021222
The number of pages: 80
Approximate weight : 240 g (0.53 lbs)
Country: International technical standard
Category: Technical standards IWA
Description / Abstract: This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments. Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.
Latest update: 2026-04-24 (Number of items: 2 274 650)
© Copyright 2026 NORMSERVIS s.r.o.