We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.
Test Facility Shakedown and Commissioning
Translate name
STANDARD published on 1.11.2017
Designation standards: SAE AIR6364
Publication date standards: 1.11.2017
SKU: NS-806920
Country: American technical standard
Category: Technical standards SAE
The paper discusses in general terms the activities required to be undertaken or demonstrated during the establishment of the facility such as:
The paper will concentrate on the main engineering engine related aspects of the facility and will not necessarily contain information on the construction validation activities such as HVAC, electrical, facility fire system, waste water etc.
Risk analysis may be performed during the design phase whose results could lead to pay particular attention to some specific equipment / functionalities during the commissioning phase. If identified, these risks should be translated to specific tests and integrated into the validation plan, either at the factory or on site or both.
If the test cell is designed to test several engine types, the acceptance process should validate upon which engine the test cell will be commissioned ? these discussions should take place at the early stage of the design process if not during the bidding phase. Moreover, an agreement between the Contractor and the Customer may have to be reached in order to clearly define how the scaling will be demonstrated in the case of the available engine types for commissioning are not representative of the full capacity upon which the facility is designed (e.g. the requirements are assessed based on future engine types). It is particularly relevant to air flow and acoustic levels and tones where effects aren’t only linear.
Correlation activities are outside the scope of this document.
Document is primary intended for typical overhaul (MRO) test cells. Development/Production facilities may include additional and specific equipment that requires dedicated shakedown and commissioning processes and procedures issued directly from the OEMs. Outdoor test cell specifics are not covered by this document.
SUBJECT TAXONOMY: Gas turbines, Turbojet engines, Turboprop engines, Test equipment and instrumentation, Test facilities
SUBFILE: Aerospace
TYPE OF DOCUMENT: Aerospace Standard
Do you want to make sure you use only the valid technical standards?
We can offer you a solution which will provide you a monthly overview concerning the updating of standards which you use.
Would you like to know more? Look at this page.
Latest update: 2025-07-11 (Number of items: 2 208 012)
© Copyright 2025 NORMSERVIS s.r.o.