UIC - International railway union - Page 104

Standards UIC - International railway union - Page 104

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 104" by:    


UIC B12/RP49-1ed.

Bases of calculation for preparing the set of diagrams for UIC Leaflet 5302

Selected format:

Show all technical information.
283.30 USD


in 7 working days
UIC B12/RP5-1ed.

Results on the static and dynamic tests carried out on the prototype vans

Selected format:

Show all technical information.
283.30 USD


in 7 working days
UIC B12/RP50-1ed.

Studies on the bogies of existing wagons in connection with their suita bility or adaptation for a maximum speed of 100 km/h

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP51-1ed.

Operating of twoaxled wagons with 22.5 t axle loads at 100 km/h Dynamic lateral behaviour

Selected format:

Show all technical information.
283.30 USD


in 7 working days
UIC B12/RP52-1ed.

Standardization of a sliding synthetic cover for type Shimm(n)s bogie wagons with fixed endwalls and loading cradles

Selected format:

Show all technical information.
283.30 USD


in 7 working days
UIC B12/RP53-1ed.

Study of Type 1 and 2 standardized flat bogie wagons regarding increasing the permissible axle load to 22.5 t (Rens/ Remmns)

Selected format:

Show all technical information.
283.30 USD


in 7 working days
UIC B12/RP54-1ed.

Reduction in the aerodynamic drag of wagons

Selected format:

Show all technical information.
283.30 USD


in 7 working days
UIC B12/RP56-1ed.

Standardization of the Y 25 bogie with radially adjustable wheelsets

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP57-1ed.

Standardization of a bogie for high capacity recess wagons

Selected format:

Show all technical information.
283.30 USD


in 7 working days
UIC B12/RP59/1-1ed.

Part 1 Further development of the MEDYNA program for ride safety studies with freight wagons in threewagonsets

Selected format:

Show all technical information.
283.30 USD


in 7 working days

Entries shown from 1030 to 1040 out of a total of 2582 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.