UIC - International railway union - Page 106

Standards UIC - International railway union - Page 106

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 106" by:    


UIC B12/RP64/1-1ed.

Revision of the buffing test conditions in Report B 12/RP 17 (Section 3.1) Volume 1 Analysis of the questionnaire sent to the railways and private wagon owners concerning the fitting of wagons with buffers and the handling of wagons during marshalling op

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP64/2-1ed.

Revision of the buffing test conditions in Report B 12/RP 17 (Section 3.1) Volume 2 Comparative tests with a view to selecting a reference buffer for the impactreceiving wagon Summary of results

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP64/3-1ed.

Revision of the buffing test conditions in Report B 12/RP 17 (Section 3.1) Volume 3 Confirmation tests for the purpose of revising the buffing test conditions

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP64/4-1ed.

Revision of the buffing test conditions in Report B 12/RP 17 (Section 3.1) Volume 4 Summary of the test results and proposals for amendments

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP66/1-1ed.

Ride behaviour of bogie wagons at 120 km/h and with a 22.5 t axleload Part 1: Results of running tests and additional tests

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP66/2-1ed.

Ride behaviour of bogie wagons at 120 km/h and with a 22.5 axleload Part 2: Characteristics of track layout and geometry of the test sections

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP67-1ed.

Dynamic behaviour of twoaxled wagons for a 22.5 t axleload and a wheelbase of less than 8 m, for speeds of 100 km/ and 120 km/h

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP69-1ed.

Propelling tests to establish the LCF that can be sustained by bogie wagons

Selected format:

Show all technical information.
424.30 USD


in 7 working days
UIC B12/RP7-1ed.

Static and dynamic tests carried out on the prototype of vans

Selected format:

Show all technical information.
283.30 USD


in 7 working days
UIC B12/RP70-1ed.

Pushing tests to determine the maximum permissible longitudinal compressive forces for bogie wagons.

Selected format:

Show all technical information.
424.30 USD


in 7 working days

Entries shown from 1050 to 1060 out of a total of 2582 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.