UIC - International railway union - Page 192

Standards UIC - International railway union - Page 192

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 192" by:    


UIC D147/RP1-1ed.

Preliminary study concerning the existing automatic marshalling yards

Selected format:

Show all technical information.
281.30 USD


in 7 working days
UIC D147/RP2-1ed.

Evaluation of existing solution for permitting very long wagons to be hump shunted with automatic control

Selected format:

Show all technical information.
281.30 USD


in 7 working days
UIC D148/RP1-1ed.

Possible ways of improving the service properties of rails by metallurgical means (Report of enquiry)

Selected format:

Show all technical information.
281.30 USD


in 7 working days
UIC D148/RP2-1ed.

Theoretical calculations of the deterioration in track geometry at discrete irregularities in track level

Selected format:

Show all technical information.
281.30 USD


in 7 working days
UIC D148/RP3-1ed.

Measurements at rail welds and compari son with theoretical prediction

Selected format:

Show all technical information.
281.30 USD


in 7 working days
UIC D148/RP4-1ed.

Statistical investigation of the unevenness of the rail running surface caused by flashbutt welds and thermit welds

Selected format:

Show all technical information.
281.30 USD


in 7 working days
281.30 USD


in 7 working days
UIC D148/RP6-1ed.

The assessment of a range of localised irregularity types encountered in rail flash butt welds

Selected format:

Show all technical information.
421.20 USD


in 7 working days
UIC D148/RP7-1ed.

Summary of conditions concerning the straightness of rails (Final report)

Selected format:

Show all technical information.
281.30 USD


in 7 working days
UIC D150/DT128-1ed.

Assessment of a flexural reponse tech nique, based on phase measurements, for the determination of longitudinal rail force, by G.S. Lane (BR)

Selected format:

Show all technical information.
281.30 USD


in 7 working days

Entries shown from 1910 to 1920 out of a total of 2621 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.