UIC - International railway union - Page 193

Standards UIC - International railway union - Page 193

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 193" by:    


UIC D151/RP10-1ed.

Vibration isolation measures on open line: Effect of added track resilience

Selected format:

Show all technical information.
427.60 USD


in 7 working days
427.60 USD


in 7 working days
UIC D151/RP12-1ed.

Final report on a study of ground vibrations due to railways

Selected format:

Show all technical information.
285.50 USD


in 7 working days
UIC D151/RP2-1ed.

An assessment of vibration counter measures in current use

Selected format:

Show all technical information.
285.50 USD


in 7 working days
UIC D151/RP3-1ed.

Theoretical prediction of ground vibrations and comparison with experimental results

Selected format:

Show all technical information.
571.00 USD


in 7 working days
UIC D151/RP4-1ed.

Effect of vibration on buildings and their occupants Analysis of the literature and commentary

Selected format:

Show all technical information.
285.50 USD


in 7 working days
UIC D151/RP5-1ed.

Vibrations produced in buildings by train operations. Evaluation of test reports of various railways

Selected format:

Show all technical information.
571.00 USD


in 7 working days
UIC D151/RP6-1ed.

Study of the long term behaviour of various antivibration measures in the track

Selected format:

Show all technical information.
427.60 USD


in 7 working days
UIC D151/RP7-1ed.

An experimental investigation of the effect of vibration on building elements

Selected format:

Show all technical information.
427.60 USD


in 7 working days
UIC D151/RP8-1ed.

Erprobung von elastischen Zwischen anlagen bei Schotteroberbau in Tunnel strecken der Metro

Selected format:

Show all technical information.
427.60 USD


in 7 working days

Entries shown from 1920 to 1930 out of a total of 2583 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.