UIC - International railway union - Page 64

Standards UIC - International railway union - Page 64

UIC – International railway union (in French "Union Internationale des Chemins de fer“, in English "International Union of Railways") is a global company, which coordinates the development and operation of railway transport in all member countries. It also solves the issues of creating new and maintaining current international connections, the unification of railway equipment. It supervises safety criteria such as interlocking plant and automatic brakes. It represents member companies at the international level.

Price display: excl. VAT
Displayed currency: USD
Sort by:

Narrow the selection for the "UIC standards - Page 64" by:    


UIC A129/DT67-1ed.

Feasibility study of the electronic arc as a means of power collection at highspeeds, up to 500 km/h, by Dr. D. Klapas, Dr. R. Hackman, Prof. F.A. Benson, Department of Electronic and Electrical Engineering, the University of Sheffield. This study was car

Selected format:
English -
Print design (276.70 USD)


Show all technical information.
276.70 USD


in 7 working days
UIC A129/DT68-1ed.

Equipment for measuring the rootmean square value of overhead lines current by Mr. K. Bauer, BZA Munich, DB (Part 1) and the PKP Research Institute (Part 2)

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A129/DT82-1ed.

High power traction current collection at high speeds on the RomeFlorence Direttissima line in April 1978, prepared by the motive power and rolling stock department of the FS

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A129/DT83-1ed.

Measurement of the contact force between pantograph and overhead contact system (BR, SNCF and DB methods), established by BR, SNCF (Direction du Matériel Département MC) and DB

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A129/DT84-1ed.

Analyse der Parameter für Gleichstrom abnehmer für Geschwindigkeiten von 250 300 km/h, aufgestellt von Frau Roman (PKP)

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A129/DT90-1ed.

Schnellfahrversuche der DB auf der Strecke GüterslohNeubeckum 1976 zur Bestimmung der Komponenten des Fahr leitungsStromabnehmersystems (Fort setzung), von Herrn D. Schmitt Manderbach, BZA München

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A129/RP1-1ed.

Dynamic behaviour of the ´Overhead contactpantograph´ system. Compa rison between results of BR simulations and SNCF track tests

Selected format:

Show all technical information.
276.70 USD


in 7 working days
276.70 USD


in 7 working days
UIC A129/RP2-1ed.

Light a.c. overhead contact equipment for high power collection at speeds up to 300 km/h

Selected format:

Show all technical information.
276.70 USD


in 7 working days
UIC A129/RP3-1ed.

Questionnaire relating to overhead line types, power supply and protection

Selected format:

Show all technical information.
276.70 USD


in 7 working days

Entries shown from 630 to 640 out of a total of 2580 entries.


Can we help you with something?


Cookies Cookies

We need your consent to use the individual data so that you can see information about your interests, among other things. Click "OK" to give your consent.

You can refuse consent here.

Here you can customize your cookie settings according to your preferences.

We need your consent to use the individual data so that you can see information about your interests, among other things.